Prevent demolition of existing building fabric by using optimum materials, construction phasing, and scalability through long range planning.
Should major interventions be necessary, plan to include the best materials and techniques to prevent future decay, the best phasing of the implementation to minimize waste of resources and maximize efficiency of time funding, and materials.